-
-
August 17, 2020 at 1:53 am
Bran
SubscriberI am doing a turbulent multiphase simulation with an injection of water vapor.
I wanted to test the inclusion of a porous media in the simulation. When I activate porous zone, I only see an option to change the porosity. In my initial testing (without the above models selected), I saw other options such as direction vector 1 and direction vector 2 as well as viscous and inertial resistance.
I had a tough time reading the user guide to find out why it was gone when I activated the other models. I'm not sure if I have the wrong settings. Was this intended or did I do something wrong?
August 17, 2020 at 8:34 amAmine Ben Hadj Ali
Ansys EmployeeThe other options are phase specific and not mixture specific. For bulk you can only provide the porosity. For the other phases you define the pressure losses independently
August 17, 2020 at 12:51 pmBran
SubscriberThank you so much! I missed checking the options for the phases.
Could you also help me by answering exactly what porosity means? Based on what I've read it means the percentage of void spaces, so if I set a porosity of 1, the whole porous zone will be a void space?
August 17, 2020 at 2:43 pmAmine Ben Hadj Ali
Ansys Employeeporosity = void where the fluids can flow through the rock.
August 17, 2020 at 5:03 pmBran
SubscriberSo if I set a porosity of 0.7, then 70% of the rock can have fluids flow?
August 17, 2020 at 5:42 pmKarthik Remella
AdministratorYes, this is correct!
Viewing 5 reply threads- The topic ‘Limited porous media options’ is closed to new replies.
Ansys Innovation SpaceTrending discussionsTop Contributors-
2773
-
960
-
835
-
599
-
591
Top Rated Tags© 2025 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.
-
We have an exciting announcement about badges coming in May 2025. Until then, we will temporarily stop issuing new badges for course completions and certifications. However, all completions will be recorded and fulfilled after May 2025.