-
-
May 9, 2022 at 11:01 pm
mriheen
SubscriberMay 16, 2022 at 5:38 amChinmay T
Forum Moderator
If the top and bottom metals are connected through vias then you have assigned the lumped port correctly.
If required, you can also draw a rectangle so that the port touches one of the top metals.
Thanks Chinmay
May 16, 2022 at 11:59 pmmriheen
SubscriberThank you for the confirmation. Appreciate it.
Viewing 2 reply threads- The topic ‘How to provide lumped port for grounded CPW?’ is closed to new replies.
Ansys Innovation SpaceTrending discussionsTop Contributors-
3139
-
1007
-
917
-
858
-
792
Top Rated Tags© 2025 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.
-
The Ansys Learning Forum is a public forum. You are prohibited from providing (i) information that is confidential to You, your employer, or any third party, (ii) Personal Data or individually identifiable health information, (iii) any information that is U.S. Government Classified, Controlled Unclassified Information, International Traffic in Arms Regulators (ITAR) or Export Administration Regulators (EAR) controlled or otherwise have been determined by the United States Government or by a foreign government to require protection against unauthorized disclosure for reasons of national security, or (iv) topics or information restricted by the People's Republic of China data protection and privacy laws.