TAGGED: project-schematic
-
-
May 23, 2022 at 5:17 pm
-
May 24, 2022 at 10:52 am
-
May 24, 2022 at 4:09 pmBen_BenSubscriberI have solved my problem. The inclusion of Mass Scaling was preventing the transfer of the solution in the project schematic. I turned off Mass Scaling, reran and the solution transfer now works.
-
Viewing 2 reply threads
- The topic ‘Failed linking of two systems in the project schematic’ is closed to new replies.
Ansys Innovation Space
Trending discussions
- LS-DYNA Installation Issues with Student Workbench 2024 R2
- Cross-coupled stiffness elements in LS-DYNA
- LS-Dyna CESE SMP d vs MPP d solver
- Mathematical model generation stuck at 10%
- CESE solver – Ignition mechanism
- About combine different unconnected body into one part
- shape memory alloy material in LS-DYNA
- Initial Stress Shell Application and HistVarCosine in LS-DYNA
- CESE combustion model
- Problem with working out the CESE LS-Dyna model
Top Contributors
-
1351
-
599
-
591
-
540
-
366
Top Rated Tags
© 2025 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.