deepak.deepak
Ansys Employee

 

Yes, you can define the preload b/w two joining parts. Preload is applied based on the bolt size and nut factor. Loading must be in steps and once preload is applied, we need the lock the preload. 

Please refer: Modeling Bolted Joints of an Axle Assembly Using Ansys Mechanical — Workshop (youtube.com) and AIS course on Modeling the Bolt and Preload | Ansys Innovation Courses

Thanks 

Deepak