-
-
January 30, 2021 at 8:04 pm
saiyedtasnim
SubscriberI am working with a reactor vessel in ANSYS Fluent. There is a core inside the vessel.
When I try to mesh the total geometry with the default settings I get the errors as shown in the photos. How to solve these errors?
Also I want to simulate the vessel with three different porosity values (upper tube unit, reactor core and bottom part of the vessel) with a pressure source and a heat sink. How to do this?
May 10, 2021 at 6:13 amKeyur Kanade
Ansys EmployeeImage shows solid model. Please extract the fluid region in SpaceClaim.
From image it looks like you are using hex dominant method. Please use patch confirming tetrahedorn method.
Please check following videos
Ansys Meshing Sizing:
https://www.youtube.com/watch?v=w4q6q8nKF3U
DM Share topology:
https://www.youtube.com/watch?v=IO4ZtwZdD2I
SpaceClaim Share topology:
https://www.youtube.com/watch?v=h43E1YO1LiM
Ansys Meshing: Decomposition for hex meshing:Â
https://www.youtube.com/watch?v=P19GOTQWmc0
Regards,
Keyur
How to access Ansys Online Help Document
How to show full resolution image
Viewing 1 reply thread- The topic ‘Meshing geometry’ is closed to new replies.
Ansys Innovation SpaceTrending discussions- How do I get my hands on Ansys Rocky DEM
- Script Error
- Unburnt Hydrocarbons contour in ANSYS FORTE for sector mesh
- Help: About the expression of turbulent viscosity in Realizable k-e model
- convergence issue for transonic flow
- Facing trouble regarding setting up boundary conditions for SOEC Modeling
- Point exception in erosion calculation
- Errors with multi-connected bodies using AQWA
- Script Error Ansys
Top Contributors-
2352
-
930
-
599
-
591
-
544
Top Rated Tags© 2025 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.
-
We have an exciting announcement about badges coming in May 2025. Until then, we will temporarily stop issuing new badges for course completions and certifications. However, all completions will be recorded and fulfilled after May 2025.