-
-
November 7, 2023 at 8:53 ammuraliSubscriber
This is the displacement probe plot for the free end of a cantilever beam subject to an initial displacement of 5e-3 m. I did this as a 2 step analysis. I have two questions:
- How should I adjust the analysis settings so that I get the displacement 5e-3 at time 0 (as it is not possible to keep the step end time as 0?) ? Or is there some way to adjust the plot once the analysis is done?
- Â How do i get rid of the points on the curve so that I have a smooth curve?
Thanks In advance.
-
November 7, 2023 at 1:24 pmErik KostsonAnsys Employee
Â
Hi
Answer to both questions is: copy the data from the displacement probe, and paste into excel and change the values as needed so they start from when you want – when plotting there you can choose a curve with no dots at the plotted values (so line only graph, dots only etc.).
All the best
Erik
Â
-
November 8, 2023 at 9:30 ammuraliSubscriber
Thanks you Erik.
-
-
Viewing 1 reply thread
- The topic ‘Post Processing in transient analysis’ is closed to new replies.
Ansys Innovation Space
Trending discussions
- Problem with access to session files
- Ayuda con Error: “Unable to access the source: EngineeringData”
- At least one body has been found to have only 1 element in at least 2 directions
- Error when opening saved Workbench project
- Geometric stiffness matrix for solid elements
- How to apply Compression-only Support?
- How to select the interface delamination surface of a laminate?
- Timestep range set for animation export
- Image to file in Mechanical is bugged and does not show text
- SMART crack under fatigue conditions, different crack sizes can’t growth
Top Contributors
-
1236
-
543
-
523
-
225
-
209
Top Rated Tags
© 2024 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.