-
-
October 4, 2023 at 7:44 pm
louiee1907
SubscriberHi,
I calculated the life and damage in nCode DesignLife, and there is damage result for every node.Â
Total accumulated damage = 0.00027Â
From Miner's Rule 1/0.00027 = 3703, so
I have 4 hours of data which is acceleration-time, and 3703*4 = 14812 hours life
This calculating true or not?Â
-
October 9, 2023 at 4:34 pm
danielshaw
Ansys EmployeeDesignLife is reporting 0.00027 damage produced by the applied loading, which is equivalent to 3703 repeats of the applied loading. If the applied loading represents 4 hours of operation, then the predicted fatigue life is 3703 repeats per 4 hours of operation, which can be converted into 4*3703 per hour of operation.
-
October 9, 2023 at 8:14 pm
louiee1907
SubscriberThank you so muchÂ
-
-
Viewing 1 reply thread
- The topic ‘Miner’s Rule’ is closed to new replies.
Innovation Space
Trending discussions
Top Contributors
-
6019
-
1906
-
1425
-
1308
-
1021
Top Rated Tags
© 2026 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.