-
-
October 4, 2017 at 12:20 pmvganoreAnsys Employee
How to increase the maximum number of equilibrium iterations per solution step in Mechanical?
-
October 17, 2017 at 10:28 amcbhavsarAnsys Employee
The maximum number of equilibrium iterations per each solution point is 25 based on the default setting of the NEQIT command. To change the maximum number of equilibrium iterations, you can issue the NEQIT command from within a Command Object. For example, issuing NEQIT,30 will increase the maximum number of equilibrium iterations to 30.
-
April 12, 2023 at 8:35 pmunknownSubscriber
Â
what is the command line to control the iteration numbers?
Â
Â
-
July 5, 2023 at 11:38 amGary WangSubscriber
https://www.ansystips.com/2017/09/increasing-number-of-iteration-per.html
Â
you can refer to the link above to add the Command object with NEQIT,30 in it.Â
-
Viewing 3 reply threads
- The topic ‘Increase the maximum number of equilibrium iterations per solution step in Mechanical’ is closed to new replies.
Ansys Innovation Space
Trending discussions
- Problem with access to session files
- Ayuda con Error: “Unable to access the source: EngineeringData”
- At least one body has been found to have only 1 element in at least 2 directions
- Error when opening saved Workbench project
- Geometric stiffness matrix for solid elements
- How to select the interface delamination surface of a laminate?
- How to apply Compression-only Support?
- Timestep range set for animation export
- SMART crack under fatigue conditions, different crack sizes can’t growth
- Image to file in Mechanical is bugged and does not show text
Top Contributors
-
1191
-
513
-
488
-
225
-
209
Top Rated Tags
© 2024 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.