-
-
October 4, 2017 at 12:20 pm
vganore
Ansys EmployeeHow to increase the maximum number of equilibrium iterations per solution step in Mechanical?
-
October 17, 2017 at 10:28 am
cbhavsar
Ansys EmployeeThe maximum number of equilibrium iterations per each solution point is 25 based on the default setting of the NEQIT command. To change the maximum number of equilibrium iterations, you can issue the NEQIT command from within a Command Object. For example, issuing NEQIT,30 will increase the maximum number of equilibrium iterations to 30.
-
April 12, 2023 at 8:35 pm
unknown
SubscriberÂ
what is the command line to control the iteration numbers?
Â
Â
-
July 5, 2023 at 11:38 am
Gary Wang
Subscriberhttps://www.ansystips.com/2017/09/increasing-number-of-iteration-per.html
Â
you can refer to the link above to add the Command object with NEQIT,30 in it.Â
-
Viewing 3 reply threads
- The topic ‘Increase the maximum number of equilibrium iterations per solution step in Mechanical’ is closed to new replies.
Ansys Innovation Space
Trending discussions
Top Contributors
-
2407
-
930
-
599
-
591
-
564
Top Rated Tags
© 2025 Copyright ANSYS, Inc. All rights reserved.
Ansys does not support the usage of unauthorized Ansys software. Please visit www.ansys.com to obtain an official distribution.