Ansys Learning Forum Forums Installation and Licensing Ansys Products AWAN simulated floating dock Reply To: AWAN simulated floating dock

Shuangxing Du
Ansys Employee

Please check if the structure of the rear side wall is fixed by a fixed joint in the time domain analysis.  If the meshes and joints are all symmetric with respect to the central vertical XZ plane between floating docks, the results should be symmetric.