March 15, 2024 at 6:26 pm
mrife
Ansys Employee
Hi javat33489
There are several ways of addressing this but one often used is to change the Time of the analysis from the default 1 to the value of the applied Force. That way these XY plots that default to value vs time become value vs appplied load.
Mike