July 31, 2023 at 1:08 pm
Rob
Forum Moderator
The wall & wall:shadow pairs should be left as coupled. Fluent will handle the HTC from the fluid to solid, and all conductivity within the solids. You only need to set the outer wall bounday conditions.Â