Initial substeps of 50 or time inc. of 1/50 = 0.02 s and the first and second time steps are at 0.02 and 0.04 s.
Minimum substeps of 25 or time inc. of 1/25 = 0.04 s and the difference between steps 4 and 5 is 0.04 s.
I hope you now see the effect too.
-