Help with Reinforced Concrete to Steel column hybrid connection

    • israelcrawford
      Subscriber

      I am currently trying to creat a hybrid connection which connects reinforced concrete directly to a steel column. I have used SOLID65 for the concrete and LINK180 for the rebar. I searched for what i believe is most of the data for doing reinforced concrete on this site thus far and used the collected information to make this model. 

      I am currently trying to understand why the model simply does not work. If i use any other material for the "concrete slab", the model runs fine and i get results. However, when i use the Solid65 and rebar(LINK180) commands the model only fails. (ERROR "An unknown error occurred during solution" and "Linear Tetrhedral elements have been used in regions with linear materials"


      IMAGE ATTACHED SHOWS QUARTER MODEL OF STEEL COLUMN CONNECTION. NOTE THE STEEL SECTIONS GO INTO THE CONCRETE SLAB


      THe contact type is bonded connection


      COMMANDS FOR SOLID65


      ET,MATID,SOLID65


      R,MATID,0,0,0,0,0,0


      RMORE,0,0,0,0,0


      MP,EX,MATID,29250


      MP,PRXY,MATID,0.2


      MPTEMP,MATID,0


      TB,CONCR,MATID,1,9


      TBTEMP,22


      TBDATA,1,0.3,0.8,3,-1


      TB,MISO,MATID,1,35,0


      TBTEMP,22


      TBPT,,0.0001,2.925


      TBPT,,0.0002,5.7


      TBPT,,0.0003,8.325


      TBPT,,0.0004,10.8


      TBPT,,0.0005,13.125


      TBPT,,0.0006,15.3


      TBPT,,0.0007,17.325


      TBPT,,0.0008,19.2


      TBPT,,0.0009,20.925


      TBPT,,0.001,22.5


      TBPT,,0.0011,23.925


      TBPT,,0.0012,25.2


      TBPT,,0.0013,26.325


      TBPT,,0.0014,27.3


      TBPT,,0.0015,28.125


      TBPT,,0.0016,28.8


      TBPT,,0.0017,29.325


      TBPT,,0.0018,29.7


      TBPT,,0.0019,29.925


      TBPT,,0.002,30


      TBPT,,0.0021,30


      TBPT,,0.0022,30


      TBPT,,0.0023,30


      TBPT,,0.0024,30


      TBPT,,0.0025,30


      TBPT,,0.0026,30


      TBPT,,0.0027,30


      TBPT,,0.0028,30


      TBPT,,0.0029,30


      TBPT,,0.003,30


      TBPT,,0.0031,30


      TBPT,,0.0032,30


      TBPT,,0.0033,30


      TBPT,,0.0034,30


      TBPT,,0.0035,30


       


      *SET,ELEM_TYPE_ID,101


      ET,ELEM_TYPE_ID,solid65


      KEYOPT,ELEM_TYPE_ID,1,0


      KEYOPT,ELEM_TYPE_ID,3,2


      KEYOPT,ELEM_TYPE_ID,5,0


      KEYOPT,ELEM_TYPE_ID,6,0


      KEYOPT,ELEM_TYPE_ID,7,1


       


      KEYOPT,ELEM_TYPE_ID,8,0


       


       


      COMMANDS FOR LINK180


      ET,matid,LINK180 


      MPDATA,EX,matid,,2e5 


      MPDATA,PRXY,matid,,0.3 


      TB,BISO,matid,1,2 


      TBDATA,,355,2100,,,, 


      R,matid,314.14,,0 !Area of Rebar


      PREPROCESS COMMANDS


      /PREP7


      ESEL,S,ENAME,,65


      ESEL,A,ENAME,,180


      ALLSEL,BELOW,ELEM


      CEINTF,0.00001, !controls mesh of rebar


      ALLSEL,ALL


      /SOLU


      OUTRES,ALL,ALL


      EQSLV,SPARSE,1.0E-8,3.0,,


      BCSOPTION,,INCORE,16000,,,OFF


      SOLCONTROL,ON,OFF,NOPL,


      NROPT,unsym,,on


      neqit,200


      KBC,0


      cutcontrol,plslimit,0.2


      LNSRCH,OFF


      cutcon,noshape,1


      THANK YOU FOR YOUR HELP 

    • LachlanConsiden
      Subscriber
      You are doing everything right. Your option is possible. All you have to do is pour the concrete correctly, install the reinforcement and wait a few days for the concrete to cure. Your construction will be strong and durable.nn
    • LachlanConsiden
      Subscriber
      You are doing everything right. Your option is possible. All you have to do is pour the concrete correctly, install the reinforcement and wait a few days for the concrete to cure. Your construction will be strong and durable.