-
-
August 20, 2024 at 7:08 pmparsaarySubscriber
Hello,
I hope you are doing well. I am making this post to ask about how to run a multi-node 2-way coupled Fluent / Rocky case.
I am trying to use my university's HPC, which runs on a Slurm job scheduling system. So far, I have been able to run some 2-way coupled cases on a) 1 node containing 40 cpu, and b) 1 node containing 24 cpu and 4 gpu: Fluent running on 20 cpu, and Rocky running on 4 cpu + 4 gpu.
I am now wondering how to set up a case that can run on multiple nodes. For instance, if I can use 2 nodes similar to the one used in option b) above, fluent would be running on 40 cpu, and rocky on 8 cpu and 8 gpu. Could you please help me with this? Thank you very much.
Best regards,
Parsa -
August 22, 2024 at 1:52 pmJackson GomesAnsys Employee
Â
Hi Parsa,
While Fluent supports distributed execution across multiple nodes, Rocky needs to run on the head node, where the GPUs are located. Rocky does not support distributed parallel execution, which should be considered when setting up your cluster.
Here is a useful link that can help:Â 2-way coupling Ansys Rocky and Fluent
Best regards
Â
Â
-
- You must be logged in to reply to this topic.
- Non-Intersected faces found for matching interface periodic-walls
- Unburnt Hydrocarbons contour in ANSYS FORTE for sector mesh
- Fluent fails with Intel MPI protocol on 2 nodes
- Help: About the expression of turbulent viscosity in Realizable k-e model
- Cyclone (Stairmand) simulation using RSM
- error udf
- Mass Conservation Issue in Methane Pyrolysis Shock Tube Simulation
- Script Error
- Facing trouble regarding setting up boundary conditions for SOEC Modeling
- UDF, Fluent: Access count of iterations for “Steady Statistics”
-
1416
-
599
-
591
-
565
-
366
© 2025 Copyright ANSYS, Inc. All rights reserved.