


{"id":160054,"date":"2021-07-03T03:51:03","date_gmt":"2021-07-03T03:51:03","guid":{"rendered":"\/forum\/forums\/topic\/transient-structure-impact-analysis\/"},"modified":"2021-07-14T11:38:19","modified_gmt":"2021-07-14T11:38:19","slug":"transient-structure-impact-analysis","status":"closed","type":"topic","link":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/","title":{"rendered":"Transient Structure | Impact Analysis"},"content":{"rendered":"<div class=\"Item-Body\">\n<div class=\"Message userContent\">\n<p>Hi, I&#039;m running a transient structure analysis for the impact of a cart.<\/p>\n<p>Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1&quot; bump. <\/p>\n<p>This problem was solved in two loading steps -Step1- Settling time due to point mass and step 2- impact loading by pushing the pusher in the X direction (Displacement constraint)<\/p>\n<p>COntacts &#8211; wheel to ground frictional with 0.1 as co-efficient of friction and pusher to cart structure frictional with co-efficient of friction as 0.1. The remaining contacts all are bonded<\/p>\n<p><strong>Results- I see that the back wheel of the cart is lifting off from the ground before the front wheel impacts. and after impact entire cart is flying. What could be the reason for this how can I control the cart to remains stay with the ground?<\/strong><\/p>\n","protected":false},"template":"","class_list":["post-160054","topic","type-topic","status-closed","hentry","topic-tag-transient-structural"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Hi, I&#039;m running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1&quot; bump. This problem was solved in two loading steps -Step1- Settling time due to point\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Ansys Learning Forum | Ansys Innovation Space\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Transient Structure | Impact Analysis | Ansys Learning Forum\" \/>\n\t\t<meta property=\"og:description\" content=\"Hi, I&#039;m running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1&quot; bump. This problem was solved in two loading steps -Step1- Settling time due to point\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2021-07-03T03:51:03+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2021-07-14T11:38:19+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Transient Structure | Impact Analysis | Ansys Learning Forum\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Hi, I&#039;m running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1&quot; bump. This problem was solved in two loading steps -Step1- Settling time due to point\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic\\\/transient-structure-impact-analysis\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/topics\\\/#listItem\",\"name\":\"Topics\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/topics\\\/#listItem\",\"position\":2,\"name\":\"Topics\",\"item\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/topics\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic-tag\\\/transient-structural\\\/#listItem\",\"name\":\"transient-structural\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic-tag\\\/transient-structural\\\/#listItem\",\"position\":3,\"name\":\"transient-structural\",\"item\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic-tag\\\/transient-structural\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic\\\/transient-structure-impact-analysis\\\/#listItem\",\"name\":\"Transient Structure | Impact Analysis\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/topics\\\/#listItem\",\"name\":\"Topics\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic\\\/transient-structure-impact-analysis\\\/#listItem\",\"position\":4,\"name\":\"Transient Structure | Impact Analysis\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic-tag\\\/transient-structural\\\/#listItem\",\"name\":\"transient-structural\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/#organization\",\"name\":\"Ansys Learning Forum\",\"description\":\"Ansys Innovation Space\",\"url\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic\\\/transient-structure-impact-analysis\\\/#webpage\",\"url\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic\\\/transient-structure-impact-analysis\\\/\",\"name\":\"Transient Structure | Impact Analysis | Ansys Learning Forum\",\"description\":\"Hi, I'm running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1\\\" bump. This problem was solved in two loading steps -Step1- Settling time due to point\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/forums\\\/topic\\\/transient-structure-impact-analysis\\\/#breadcrumblist\"},\"datePublished\":\"2021-07-03T03:51:03+00:00\",\"dateModified\":\"2021-07-14T11:38:19+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/#website\",\"url\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/\",\"name\":\"Ansys Learning Forum\",\"description\":\"Ansys Innovation Space\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/innovationspace.ansys.com\\\/forum\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Transient Structure | Impact Analysis | Ansys Learning Forum","description":"Hi, I'm running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1\" bump. This problem was solved in two loading steps -Step1- Settling time due to point","canonical_url":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum#listItem","position":1,"name":"Home","item":"https:\/\/innovationspace.ansys.com\/forum","nextItem":{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/topics\/#listItem","name":"Topics"}},{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/topics\/#listItem","position":2,"name":"Topics","item":"https:\/\/innovationspace.ansys.com\/forum\/topics\/","nextItem":{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic-tag\/transient-structural\/#listItem","name":"transient-structural"},"previousItem":{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic-tag\/transient-structural\/#listItem","position":3,"name":"transient-structural","item":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic-tag\/transient-structural\/","nextItem":{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/#listItem","name":"Transient Structure | Impact Analysis"},"previousItem":{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/topics\/#listItem","name":"Topics"}},{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/#listItem","position":4,"name":"Transient Structure | Impact Analysis","previousItem":{"@type":"ListItem","@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic-tag\/transient-structural\/#listItem","name":"transient-structural"}}]},{"@type":"Organization","@id":"https:\/\/innovationspace.ansys.com\/forum\/#organization","name":"Ansys Learning Forum","description":"Ansys Innovation Space","url":"https:\/\/innovationspace.ansys.com\/forum\/"},{"@type":"WebPage","@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/#webpage","url":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/","name":"Transient Structure | Impact Analysis | Ansys Learning Forum","description":"Hi, I'm running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1\" bump. This problem was solved in two loading steps -Step1- Settling time due to point","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/innovationspace.ansys.com\/forum\/#website"},"breadcrumb":{"@id":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/#breadcrumblist"},"datePublished":"2021-07-03T03:51:03+00:00","dateModified":"2021-07-14T11:38:19+00:00"},{"@type":"WebSite","@id":"https:\/\/innovationspace.ansys.com\/forum\/#website","url":"https:\/\/innovationspace.ansys.com\/forum\/","name":"Ansys Learning Forum","description":"Ansys Innovation Space","inLanguage":"en-US","publisher":{"@id":"https:\/\/innovationspace.ansys.com\/forum\/#organization"}}]},"og:locale":"en_US","og:site_name":"Ansys Learning Forum | Ansys Innovation Space","og:type":"article","og:title":"Transient Structure | Impact Analysis | Ansys Learning Forum","og:description":"Hi, I'm running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1&quot; bump. This problem was solved in two loading steps -Step1- Settling time due to point","og:url":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/","article:published_time":"2021-07-03T03:51:03+00:00","article:modified_time":"2021-07-14T11:38:19+00:00","twitter:card":"summary_large_image","twitter:title":"Transient Structure | Impact Analysis | Ansys Learning Forum","twitter:description":"Hi, I'm running a transient structure analysis for the impact of a cart.Loading pattern-The cart was loaded with a point mass of 168kg and pushed the cart with a pusher for a distance of 100 mm against obstruction of 1&quot; bump. This problem was solved in two loading steps -Step1- Settling time due to point"},"aioseo_meta_data":{"post_id":"160054","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"content","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"created":"2024-10-28 20:29:41","updated":"2024-10-28 20:29:41","ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/innovationspace.ansys.com\/forum\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/innovationspace.ansys.com\/forum\/topics\/\" title=\"Topics\">Topics<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic-tag\/transient-structural\/\" title=\"transient-structural\">transient-structural<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTransient Structure | Impact Analysis\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/innovationspace.ansys.com\/forum"},{"label":"Topics","link":"https:\/\/innovationspace.ansys.com\/forum\/topics\/"},{"label":"transient-structural","link":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic-tag\/transient-structural\/"},{"label":"Transient Structure | Impact Analysis","link":"https:\/\/innovationspace.ansys.com\/forum\/forums\/topic\/transient-structure-impact-analysis\/"}],"acf":[],"custom_fields":[{"0":{"_bbp_author_ip":[""],"_bbp_old_reply_author_name_id":["Anonymous"],"_bbp_old_is_reply_anonymous_id":["false"],"_btv_view_count":["3047"],"_bbp_likes_count":["0"],"_bbp_topic_status":["unanswered"],"_bbp_status":["publish"],"_bbp_topic_id":["160054"],"_bbp_forum_id":["27791"],"_bbp_engagement":["199","240","156272","180472"],"_bbp_voice_count":["4"],"_bbp_reply_count":["18"],"_bbp_last_reply_id":["184328"],"_bbp_last_active_id":["184328"],"_bbp_last_active_time":["2021-07-14 11:38:19"]},"test":"happykiran"}],"_links":{"self":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/topics\/160054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/topics"}],"about":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/types\/topic"}],"version-history":[{"count":0,"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/topics\/160054\/revisions"}],"wp:attachment":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/media?parent=160054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}