


{"id":372758,"date":"2024-07-19T13:51:50","date_gmt":"2024-07-19T13:51:50","guid":{"rendered":"https:\/\/innovationspace.ansys.com\/forum\/forums\/reply\/372758\/"},"modified":"2024-07-19T13:51:50","modified_gmt":"2024-07-19T13:51:50","slug":"372758","status":"publish","type":"reply","link":"https:\/\/innovationspace.ansys.com\/forum\/forums\/reply\/372758\/","title":{"rendered":"Reply To: AWAN simulated floating dock"},"content":{"rendered":"<p>&lt;p&gt;Please check if the structure of the rear side wall is fixed by a fixed joint in the time domain analysis.&nbsp; If the meshes and joints are all symmetric with respect to the central vertical XZ plane between floating docks, the results should be symmetric.&lt;\/p&gt;<\/p>\n","protected":false},"template":"","class_list":["post-372758","reply","type-reply","status-publish","hentry"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/replies\/372758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/replies"}],"about":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/types\/reply"}],"version-history":[{"count":0,"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/replies\/372758\/revisions"}],"wp:attachment":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/media?parent=372758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}