


{"id":212936,"date":"2022-04-28T16:29:42","date_gmt":"2022-04-28T16:29:42","guid":{"rendered":"\/forum\/forums\/reply\/212936\/"},"modified":"2022-04-28T16:29:42","modified_gmt":"2022-04-28T16:29:42","slug":"212936","status":"publish","type":"reply","link":"https:\/\/innovationspace.ansys.com\/forum\/forums\/reply\/212936\/","title":{"rendered":"Reply To: what is the suitable mooring line?"},"content":{"rendered":"<p>Hello, <br \/>\nto check that all the parameters are correct in your modelling, there are few checks you can do.<br \/>\nThe first one is ensuring the hydrostatic results (under the Hydrodynamic system) : the diagonal elements of the hydrostatic stiffness matrix should be positive. You can also check that the displaced volume is positive and smaller than the equivalent volumetric displacement.<br \/>\nSecondly, you can check the cable properties (highlighted items) so we can single out that the issue is down the the cable properties rather than the model definition.<br \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"\/forum\/wp-content\/uploads\/forum-uploads\/779\/TUWRZ4TJNCKS.png\" width=\"429\" height=\"330\" \/>I hope this helps.<br \/>\nKind regards, Ingrid<\/p>\n","protected":false},"template":"","class_list":["post-212936","reply","type-reply","status-publish","hentry"],"aioseo_notices":[],"acf":[],"_links":{"self":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/replies\/212936","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/replies"}],"about":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/types\/reply"}],"version-history":[{"count":0,"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/replies\/212936\/revisions"}],"wp:attachment":[{"href":"https:\/\/innovationspace.ansys.com\/forum\/wp-json\/wp\/v2\/media?parent=212936"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}